FAQs
More FAQs- Will the application of urethane disrupt my business?
- Are there instructions to follow after my carpets are cleaned?
- Does urethane have an odour during application?
The initial application process will require stripping any existing coatings and applying urethane coating plus drying time. This process can be done after hours and will require only daily cleaning for the life of the finish, averaging two years. Because there is no buffing or recoating for that time period, there will be no other disruptions. The reapplication process will not require further stripping.
Immediately after cleaning, it’s best to allow carpets to dry for 6-8 hours before walking on them. Walking on them may flatten the fibers. Use air movers if needed to help air circulation as this will speed up the drying time. If a carpet protector such as ScotchgardTM was applied, foot traffic should be minimized for up to 24 hours to let the product cure. Don’t move any furniture back in place until carpet is completely dry or the Scotchgard carpet protector has cured.
Urethane finish contains no VOCs or solvents, which are often the source of odour and even harmful fumes. Urethane finish has a very light, almost unnoticeable, clean scent.