FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- When will I be able to walk on the carpet after it has been cleaned?
- How do I maintain this floor after the urethane application?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
This depends on whether a low-moisture encapsulation or a deep clean of your carpet has been applied. However, a general rule of thumb is to allow a drying time of six to eight hours before you can walk on your carpet.
Leave the daily cleaning to the professionals at ServiceMaster Clean serving Burlington, Hamilton, Oakville, Milton, Guelph. We offer daily, weekly or monthly cleaning services for your facility. Urethane finish requires only damp mopping on a daily basis or the use of an auto scrubber with a white or red pad or a soft brush. Mop with a properly diluted neutral cleansing agent and warm water. Overuse of cleaning chemicals can build up and leave a residual film on the floor. Never buff your floor; a loss of gloss may occur.